* chore: use pgx v5
* chore: update go version
* remove direct pq dependency
* remove unnecessary type
* scan test
* map scanner
* converter
* uint8 number array
* duration
* most unit tests work
* unit tests work
* chore: coverage
* go 1.21
* linting
* int64 gopfertammi
* retry go 1.22
* retry go 1.22
* revert to go v1.21.5
* update go toolchain to 1.21.8
* go 1.21.8
* remove test flag
* go 1.21.5
* linting
* update toolchain
* use correct array
* use correct array
* add byte array
* correct value
* correct error message
* go 1.21 compatible
* docs(api): describe which flow and trigger types word together
* docs(actions): describe which flow and trigger types work together
* Update management.proto
---------
Co-authored-by: Livio Spring <[email protected]>
Even though this is a feature it's released as fix so that we can back port to earlier revisions.
As reported by multiple users startup of ZITADEL after leaded to downtime and worst case rollbacks to the previously deployed version.
The problem starts rising when there are too many events to process after the start of ZITADEL. The root cause are changes on projections (database tables) which must be recomputed. This PR solves this problem by adding a new step to the setup phase which prefills the projections. The step can be enabled by adding the `--init-projections`-flag to `setup`, `start-from-init` and `start-from-setup`. Setting this flag results in potentially longer duration of the setup phase but reduces the risk of the problems mentioned in the paragraph above.
* fix(setup): unmarshal of failed step
* fix(cleanup): cleanup all stuck states
* use lastRun for repeatable steps
* typo
---------
Co-authored-by: Livio Spring <[email protected]>
* start user by id
* ignore debug bin
* use new user by id
* new sql
* fix(sql): replace STRING with text for psql compatabilit
* some changes
* fix: correct user queries
* fix tests
* unify sql statements
* use specific get user methods
* search login name case insensitive
* refactor: optimise user statements
* add index
* fix queries
* fix: correct domain segregation
* return all login names
* fix queries
* improve readability
* query should be correct now
* cleanup statements
* fix username / loginname handling
* fix: psql doesn't support create view if not exists
* fix: create pre-release
* ignore release comments
* add lower fields
* fix: always to lower
* update to latest projection
---------
Co-authored-by: Livio Spring <[email protected]>
* fix(eventstore): differentiate unique constraint error format
* docs: add comment to eventstore vars
* fix(eventstore): return correct error type if unique constraint already exists
This implementation increases parallel write capabilities of the eventstore.
Please have a look at the technical advisories: [05](https://zitadel.com/docs/support/advisory/a10005) and [06](https://zitadel.com/docs/support/advisory/a10006).
The implementation of eventstore.push is rewritten and stored events are migrated to a new table `eventstore.events2`.
If you are using cockroach: make sure that the database user of ZITADEL has `VIEWACTIVITY` grant. This is used to query events.
feat(storage): read only transactions for queries (#6415)
* fix: tests
* bastle wie en grosse
* fix(database): scan as callback
* fix tests
* fix merge failures
* remove as of system time
* refactor: remove unused test
* refacotr: remove unused lines
* fix: tests
* bastle wie en grosse
* fix(database): scan as callback
* fix tests
* fix merge failures
* remove as of system time
* refactor: remove unused test
* refacotr: remove unused lines
* pipeline runs on ubuntu instead of docker
* added Makefile to build zitadel core (backend) and console (frontend)
* pipeline runs in parallel where possible
* pipeline is split into multiple jobs
* removed goreleaser
* added command to check if zitadel instance is running
### Definition of Ready
- [ ] I am happy with the code
- [ ] Short description of the feature/issue is added in the pr
description
- [ ] PR is linked to the corresponding user story
- [ ] Acceptance criteria are met
- [ ] All open todos and follow ups are defined in a new ticket and
justified
- [ ] Deviations from the acceptance criteria and design are agreed with
the PO and documented.
- [ ] No debug or dead code
- [ ] My code has no repetitions
- [ ] Critical parts are tested automatically
- [ ] Where possible E2E tests are implemented
- [ ] Documentation/examples are up-to-date
- [ ] All non-functional requirements are met
- [ ] Functionality of the acceptance criteria is checked manually on
the dev system.
### Definition of Ready
- [ ] I am happy with the code
- [ ] Short description of the feature/issue is added in the pr
description
- [ ] PR is linked to the corresponding user story
- [ ] Acceptance criteria are met
- [ ] All open todos and follow ups are defined in a new ticket and
justified
- [ ] Deviations from the acceptance criteria and design are agreed with
the PO and documented.
- [ ] No debug or dead code
- [ ] My code has no repetitions
- [ ] Critical parts are tested automatically
- [ ] Where possible E2E tests are implemented
- [ ] Documentation/examples are up-to-date
- [ ] All non-functional requirements are met
- [ ] Functionality of the acceptance criteria is checked manually on
the dev system.